
Tub-to-Shower Conversion Austin
Tub-to-shower conversions planned for drain, framing, and waterproofing.
Tub-to-shower conversion in West Austin & Travis County
Swapping a tub for a shower can change a small bath. It only works if the drain, water supply, and waterproofing are rethought. Not just covered up.

Professional installation
Licensed & insured
Why homeowners choose this work
Swapping a tub for a shower can change a small bath. It only works if the drain, water supply, and waterproofing are rethought. Not just covered up.
Depth
A safer shower without surprise rework
Drain location, clearances, and door swing matter for comfort and code. We check whether a conversion needs subfloor or framing work. You should not be left with a tight shower that feels like an afterthought.
Flow
How we approach your tub-to-shower conversion
In-home consult & scope
We look at layout, wet-wall stacks, vent paths, and access. Then we check measurements against your fixture and tile picks.
Design, selections & proposal
You get a written plan, allowances, a milestone calendar, and pricing tied to your picks. We do not open surfaces without an agreed path.
Build, quality checks & closeout
We build with protected walk paths. We track inspections. We walk the job with you, cover the punch list, and hand over care notes and warranty papers.
What often goes wrong with tub-to-shower conversion (and how we avoid it)
- 01Assuming the existing drain can serve a new pan without a move.
- 02Losing a tub in the only full bath when resale and family needs still matter.
- 03Tight clearances for door swing and grab-bar backing.
Local experience, remodel-focused craftsmanship
A tub-to-shower swap is more than demo. Framing, drain moves, and waterproofing all need a plan. We protect rooms below. We check venting. We pick a pan that matches your tile. Families call us for a safer bath without surprise rework.
Included
Key features & benefits
Each item below is a deliverable we document on this scope—so expectations stay clear from proposal through punch list.
Free consultation
Clear written proposals
Skilled in-house and vetted trade partners
Jobsite care & dust control
Warranty on workmanship (details in contract)
Related services

Walk-In Showers
Walk-in showers with correct slope, drain, and waterproofing.
View Walk-In ShowersShower work alone is often 1 to 2 weeks of active build within a bath project. Full bath timelines vary.
Vanities & Storage
Vanities and bath storage lined up with plumbing, lighting, and daily use.
View Vanities & StorageOften installed over a few days as part of a bath remodel. Tops may follow templating.Begin today
If a tub-to-shower conversion is on the table, share what is not working and what you wish was different. We will visit, look behind the obvious, and write a plan that fixes the wet-area basics before any tile pick.
Clarity
Frequently Asked Questions
Many conversions are several days to two weeks of field time. Plumbing moves and tile scope change the calendar.
Each proposal lists wet-area assemblies, fixture allowances, the rough-in plan, and a milestone calendar against cabinet, stone, and tile wait times. Inspections and any pick changes are tracked so the paperwork matches the build.
Yes. Our core area is West Austin and Travis County. We often work in Bee Cave, Lakeway, West Lake Hills, Rollingwood, and Dripping Springs. Share the address when you contact us. We will confirm we are the right fit before booking a visit.
Get in touch
Ready to move from idea to plan?
Send a few photos and a short note about what is not working today. We will follow up with the next step. Usually a site visit and a written plan you can review.
