
Walk-In Showers Austin
Walk-in showers with correct slope, drain, and waterproofing.
Walk-in shower design & build in West Austin & Travis County
Walk-in showers need correct drainage, support for glass, and slip-resistant surfaces. We design for safety and easy cleaning. Not just a pretty photo.

Professional installation
Licensed & insured
Why homeowners choose this work
Walk-in showers need correct drainage, support for glass, and slip-resistant surfaces. We design for safety and easy cleaning. Not just a pretty photo.
Depth
Slope, drain, and waterproofing have to work together
A shower fails slowly when waterproofing and slope are off. We plan curb or curbless transitions with care. We set waterproof layers as the maker intends. We pick tile sizes and grouts that suit wet use.
Flow
How we approach your walk-in showers
In-home consult & scope
We look at layout, wet-wall stacks, vent paths, and access. Then we check measurements against your fixture and tile picks.
Design, selections & proposal
You get a written plan, allowances, a milestone calendar, and pricing tied to your picks. We do not open surfaces without an agreed path.
Build, quality checks & closeout
We build with protected walk paths. We track inspections. We walk the job with you, cover the punch list, and hand over care notes and warranty papers.
What often goes wrong with walk-in showers (and how we avoid it)
- 01Pans with weak slope or poorly integrated linear drains.
- 02Niches placed where studs and waterproofing are awkward.
- 03Frameless glass spec without enough blocking or plumb walls.
Local experience, remodel-focused craftsmanship
Walk-in showers last when slope, drain, and waterproofing work together. We use proven membrane systems. We plan the drain for fall. We set glass to studs, not drywall. Clients pick us for a wet area that holds up through years of daily use.
Included
Key features & benefits
Each item below is a deliverable we document on this scope—so expectations stay clear from proposal through punch list.
Free consultation
Clear written proposals
Skilled in-house and vetted trade partners
Jobsite care & dust control
Warranty on workmanship (details in contract)
Related services

Tub-to-Shower Conversion
Tub-to-shower conversions planned for drain, framing, and waterproofing.
View Tub-to-Shower ConversionMany conversions are several days to two weeks of field time. Plumbing moves and tile scope change the calendar.
Vanities & Storage
Vanities and bath storage lined up with plumbing, lighting, and daily use.
View Vanities & StorageOften installed over a few days as part of a bath remodel. Tops may follow templating.Begin today
If a walk-in showers is on the table, share what is not working and what you wish was different. We will visit, look behind the obvious, and write a plan that fixes the wet-area basics before any tile pick.
Clarity
Frequently Asked Questions
Shower work alone is often 1 to 2 weeks of active build within a bath project. Full bath timelines vary.
Each proposal lists wet-area assemblies, fixture allowances, the rough-in plan, and a milestone calendar against cabinet, stone, and tile wait times. Inspections and any pick changes are tracked so the paperwork matches the build.
Yes. Our core area is West Austin and Travis County. We often work in Bee Cave, Lakeway, West Lake Hills, Rollingwood, and Dripping Springs. Share the address when you contact us. We will confirm we are the right fit before booking a visit.
Get in touch
Ready to move from idea to plan?
Send a few photos and a short note about what is not working today. We will follow up with the next step. Usually a site visit and a written plan you can review.
